By using our website, you agree to the use of cookies as described in our Cookie Policy
Keeping Dallas-Fort Worth Projects on Track with Roof Trusses
Hundreds of trusses, zero excuses. Dallas-Fort Worth construction jobs run on tight timelines and big expectations. Trusses have to show up right, every time. No delays, no mistakes, no missing pieces. One late delivery or off-spec part can throw the whole job off. That’s not an option.

Our manufacturing process doesn’t just keep up. It sets the pace. Custom roof trusses roll off the line in high volume, each one matching the exact requirements of your plans. Whether you’re framing a new retail center or a multi-phase apartment complex, the output stays consistent. No surprises. No last-minute changes. Just steady, reliable supply.
- Automated lines keep every truss identical, no matter the order size
- Quality checks catch issues before they leave the floor
- Dedicated teams focus on large-scale runs, not one-off jobs
- Rush orders get priority without sacrificing accuracy
- Advanced design software handles complex truss configurations with ease
Every truss faces a battery of tests before it ships. Load checks. Dimensional reviews. Fastener inspections. The process weeds out weak links. The result: trusses that hold up under pressure, fit the first time, and keep your project moving forward.
Delivery That Keeps Crews Working
Traffic in DFW doesn’t care about your schedule. Road closures, site restrictions, and shifting deadlines can throw off even the best-laid plans. That’s why delivery needs more than a truck and a map. It takes real coordination. Our logistics team tracks every variable: rush hour, site access, and the flow of work on the ground. Deliveries land when crews need them, not hours before or after.
We use staging yards across the metroplex. Materials sit close to the job, not miles away. When it’s time, our fleet moves fast. Multiple drops in a single day? No problem. Tight windows? We hit them. This approach keeps your site supplied and your schedule intact. No waiting for the next load. No idle crews. Just steady progress.
- Staging yards reduce haul times and keep trusses close to active sites
- Flexible scheduling adapts to shifting project needs
- Experienced drivers know the routes and the sites
- Communication stays tight. No missed calls, no lost loads
Developments with phased construction see the biggest gains. As one section wraps, the next batch of trusses arrives. The build never stalls. The project stays on track.
Installation Backed by Real Support
Getting trusses onto a roof isn’t just about muscle. It’s about timing, safety, and precision. Crews need clear plans and the right equipment. Our installation specialists work side by side with your team. We coordinate crane schedules, set up safe lifting zones, and walk through the layout before the first truss goes up.
Technical advisors stay available for the important phases. Questions about placement? They answer on the spot. Need a quick adjustment? They handle it. The goal: every truss lands where it should, the first time. No wasted lifts. No rework. Just a clean, efficient install that keeps the build moving.
- Detailed layout plans eliminate uncertainty
- On-site support for complex or high-volume installs
- Direct coordination with crane operators and site leads
- Clear safety protocols keep crews protected
When installation runs smooth, the rest of the project follows. Framing stays on schedule. Other trades get to work sooner. The jobsite runs like a machine.
Trusses That Stand Up to Texas
DFW weather doesn’t pull punches. Summer heat warps materials. Winter storms test every joint. Wind gusts push structures to their limits. Trusses built for this region can’t cut corners. Our engineered designs factor in every local challenge. Wind loads. Snow buildup. Thermal movement. Each truss gets built to handle the extremes, not just the averages.
Over decades, these details matter. Weak trusses sag. Fasteners loosen. Rooflines shift. The Texas Truss Company approach keeps structures solid year after year. No creeping deflection. No surprise repairs. Just roofs that hold their shape and protect what’s underneath.
- Designs account for real-world wind and weather, not just code minimums
- Materials resist warping and splitting in Texas heat
- Connections stay tight through freeze-thaw cycles
- Every truss gets built for the long haul, not just the first inspection
Developers and builders across DFW see the difference. Fewer callbacks. Fewer warranty claims. More projects finished on time and on budget.
Ready to Supply Your Next Major Project?
Call Texas Truss Company at 407-431-4263 or contact us to discuss your commercial or multi-family truss requirements.
‹ Back

